Skip to content
Linewise Communications
  1. Linewise Communications
  2. Projects

Projects

Selected packages for data centres and critical facilities. Illustrative projects for this demo.

01

Data hall fibre backbone

Fibre trunks run through overhead tray between halls and racks.

Location
Western Sydney, NSW
Package
Fibre backbone
Head contractor
Sample head contractor
Completed
2026
  • MPO/MTP trunks
  • Overhead raceway
  • OTDR results by core

View project: data hall fibre

02

Cat6A fit-out

Copper cabling terminated and labelled to the rack schedule.

Location
Melbourne, VIC
Package
Structured cabling
Head contractor
Sample head contractor
Completed
2025
  • Cat6A horizontal cabling
  • Patch panel termination
  • Port labelling

View project: cat6a fit out

03

Rack cabling certification

Every link in a new hall tested and certified before handover.

Location
Sydney, NSW
Package
Testing and certification
Head contractor
Sample head contractor
Completed
2025
  • Copper certification
  • Loss testing
  • Results by port

View project: rack cabling certification

How a project runs

The same four stages on every package.

  1. Tender and design review

    We price from your drawings and raise clashes before site start.

  2. Install

    A dedicated crew, staged to the builder's programme.

  3. Test and commission

    Witnessed testing, with results recorded as we go.

  4. Handover

    As-builts, test records and manuals, complete on day one.

Planning a similar package?

Send us your drawings