Practice · Nov 2026 · 4 min read

Draw it before you fund it

Marta Lindqvist, Principal

Open country with a few gum trees

A program can be approved in an afternoon and take three years to untangle. The trouble usually starts in the gap between the announcement and the first working plan, when everyone is busy and nobody has drawn the thing that is about to be built.

We mean draw it literally. One sheet, one page, boxes and lines. Not a strategy on a page with five pillars, but a plan of how a person, a form, a decision and a payment will move through the organisation.

Drawing is cheap. It is the last cheap moment in most programs.

What the sheet should show

Start with the person at the edge of the page. Who are they, what do they want, and what do they have in their hand when they arrive? Then follow them. Each time something has to be checked, approved, stored or sent, draw it. Each time the work passes from one team to another, draw a thick line.

The thick lines are where programs fail. A hand-over with no owner on either side is a hole in the floor, and it will be found by the first person who walks across it.

Put a number beside each step: how many a day, how many minutes, how many people. Rough numbers are fine. You are not trying to be right. You are trying to find the step that is wrong by a factor of ten.

A plan you cannot draw is a plan you do not have yet.

Draw the current state first

It is tempting to start with the future. Resist it for a week. The current state is full of arrangements that nobody wrote down: the officer who rings ahead, the spreadsheet that fixes the system, the form that is kept because one court once asked for it.

Some of these are workarounds you can remove. Others are the structure that is holding up the roof. You cannot tell which until they are on the sheet, and the people who can tell you are rarely the ones in the planning meeting.

We draw with them, standing up, on paper large enough to walk along. It takes two days. By the second afternoon someone always says, “I did not know you did that.” That sentence has saved our clients more money than any model we have built.

Mark what would change the design

When the future state is drawn, mark the assumptions on it. This works if half of people apply online. This works if approvals take a day. This works if the two databases can be joined. Give each mark a number and a date by which you will know.

Now the drawing is also a schedule. Test the assumptions that would change the shape first, and leave the ones that only change the colour until later. If a test fails, you move a line on a sheet of paper, which is a far better day than moving a team.

Keep it current

The drawing is not finished when the money arrives. Keep it on the wall, date each version and redraw it when something moves. New staff can read it in ten minutes. Reviewers can compare what was built with what was planned. Ministers and boards can see, on one page, what they agreed to.

None of this is sophisticated. Builders have worked this way for a very long time, because a mistake on paper costs a pencil and a mistake on site costs a wall. Services deserve the same care.