Most briefs we receive are long. They describe the history, the stakeholders, the constraints and the hopes, often across twenty pages. Very few say, in one sentence, what decision the work is meant to support.
That sentence matters more than everything around it. When it is missing, every party fills the gap with their own version, and the project quietly becomes several projects.
We have never seen a project fail because its brief was too short. We have seen plenty drift because the brief was so full that nobody could say which part of it mattered.
Before anything else, we ask: who needs to decide what, and by when? If the answer is unclear, that is the first piece of work — not a delay to it.
A useful test is to write the decision as a question with two or three possible answers. “Should the grant round open twice a year, or stay annual?” is a decision. “Improve the grants experience” is a hope. Both are worth having, but only one of them can be finished.
The same test shows you who has to be in the room. If the person who will make the choice has not read the brief, the brief is not ready.
A brief is not a description of a problem. It is a promise about what will be decided.
A good brief can be a page. It names the decision, the people who will make it, what they already know, and what would change their mind. Everything else can live in an appendix.
We use five headings: the decision, the date it is due, what is already known, what is not known, and what is out of scope. The last one is the hardest to write and the most useful to read. It tells everyone which good ideas are being left for another day.
A page also changes how a brief is approved. People read it properly. They argue with a sentence rather than nodding at a document, and the argument happens before the money is spent.
We leave out the background everyone in the room already knows, the list of every stakeholder, and the outputs chosen before the question was understood. None of it is wrong; it just isn’t the brief.
Methods usually come out too. If the brief asks for six workshops and a survey, the team will run six workshops and a survey, whether or not they answer the question. It is better to say what must be known by the end and let the people doing the work choose how to find out.
Reporting schedules, templates and contract terms still need a home. Put them in a second document and keep it close. They matter a great deal to how the work is run and very little to why it exists.
Some work needs detail. A system specification, a safety review or a legal reform cannot be described in a page, and it would be careless to try. Even then, the first page should still say what will be decided. The detail then has something to be detailed about.
If you have a long brief on your desk now, try this before you send it. Cover everything except the first paragraph and give it to someone outside the project. Ask them what will be different when the work is done. If they can answer, you are ready. If they cannot, you have an afternoon of editing ahead of you, and it will be the best afternoon the project has.
Shorter briefs are harder to write. That is the point.